According to Wikipedia, Agile software development is a conceptual framework for software engineering that promotes development iterations throughout the life-cycle of the project. Simply put, Agile allows your team to identify the most critical features of the software that can be completed within a short time frame (normally 1 to 2 months), and it delivers a complete build with this set of limited features as the first iteration. Once that is done, you can move those features to production or continue on to the next iteration. By breaking the releases into shorter stints, it allows you to gain quicker releases and to capture return on investment more quickly by putting the working (but limited) features into production sooner. This is in stark contrast to the more traditional “Waterfall” approach, where you design all features upfront, code each one, test each one, then move into production. Agile projects are iteratively released to production months where Waterfall projects normally span a year or more before they are released to production.
Scrum is process of implementing Agile, where features are delivered in 30 day sprints. Scrum borrows its name from Rugby, where a sprint is the process of stopping play, then vigorously playing until the sprint ends and a new one begins. The same idea applies here, where you define the requirements for a 30 day sprint and work on them with vigor for 30 days without being sidetracked by other things or having things re-prioritized. A specific feature is not recognized as being completed until it is analyzed, designed, coded, tested, re-factored and documented. At the end of the 30 day sprint, most features defined in the 30-day sprint should be completed. If some did not get finished (because of being underestimated), the uncompleted features can be moved to a later sprint. A sprint is considered successful if all the completed features have high quality and can be put into production (or beta) upon ending the sprint.
Managing Scrum development requires a major change in how teams work together. In traditional Waterfall development, teams normally have a project sponsor, a project manager, analysts, designers, programmers, testers, and documentation specialists. Each team member has specific duties which normally do not overlap and they have a specific reporting structure (most team members report to the project manager). With Scrum, you have just 3 team roles and is normally limited to 7 or less individuals (however, you can have multiple Scrum teams in sets of 7 or less):
Scrum begins with an 8 hour Scrum Kickoff Meeting. The Scrum Kickoff meeting is divided into (2) 4 hour segments, where you first determine what features are desired for the 30 day sprint. The last 4 hours are used to provide rough estimates for the items identified for the sprint. If the estimates exceed the available resources, the features are prioritized and less important features are dropped from the sprint. An important component of Scrum is using a time-box approach, where meetings and events have a definite time period (e.g. no more than 8 hours for the kickoff meeting) and this time-box is strictly enforced. Once the features are locked in for the 30-day sprint, no changes are allowed (new features can not be introduced until the next sprint). When estimating features for a sprint, the estimates must include time for analysis, design, coding, testing, re-factoring, and documentation. A feature is not considered complete until all those things are done. Each day, a Daily Scrum Meeting is held to determine how the features are progressing. The meeting is no longer than 15 minutes, and each team member is asked 3 questions:
From a programmer’s perspective, Scrum development is a new paradigm which is very empowering but does require them to follow specific rules:
Once a Scrum 30 day sprint is completed, all features that were completed can then been moved to a beta or production environment. Following the sprint is a Retrospective (post mortem), where team members discuss and document things that went well and things that can be improved upon in the next sprint.